Our client is a premium dairy product producer, delivering dairy product such as creams and cheese into the UK market.
They invested into a Biogas plant a number of years back to utilise their waste stream of dairy byproducts and agri wastes.
The plant has 3no. CHP’s and 1no. gas Upgrader unit on site. The site required Heat back up for CHP outage and planned maintenance.
Designed and delivered a skid mounted 600kw biogas boiler. this compact solution was intended to slide neatly into an existing building.
Due to changes in the plant mechanical installation the predetermined space had to be filled and so the client required the boiler to be housed with a containerised plant room.
We fabricated a plant room to their specification and secure the skid in place.
The plant room was then lifted into place on site and pipework for gas, water and heating connected.