The boiler provides additional heat for peak demands and back up for one of the4 CHP’s on site.
Fully modulating the boiler can provide a heat range of 150-720kw, the wider site Scada provides boiler enable and remote fuel selection.
Designed, prefabricated, installation on site and commission of containerised plant room.
1 dual fuel 720kw boiler and modulating burner (Biogas/Oil), Biogas booster, expansion and pressurisation control, large heating manifold for site integration, bespoke control panel, gas safety panel and interlock.
720kw on Biogas and heating oil delivered to manifold and then to pasteurisation and digester heating.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |