The client required a backup dual fuel boiler to provide heat to the anaerobic digestion and de-watering plant in the event of CHP downtime or biological failure. We provided a bespoke pre-packaged plant manufactured and soft commissioned in our workshop.
The plant was delivered to the site, craned into position on a 4-meter high concrete mezzanine. The mechanical and electrical installation was completed before onsite commissioning.