This client required a biogas system to make use of the excess gas being produced at their AD plant. The heat produced is distributed to the site for drying via 2 Lenz dryers providing drying capacity of 520kW used to dry separated digestate for animal bedding and for Digester heating. We allowed an extra output for future expansion.
The plant rooms were installed into a 40ft high cube container with partition, both plant rooms contain a 199kW Viessmann boiler & modulating burner, biogas booster with all necessary ancillary control, pressure equipment and Ofgem metering requirements. We also provided 2 manifolds to distribute the heat across the multiple applications the client required.
Taking 6weeks to fabricate in our workshop the plant room was shipped to site ready for connection to onsite interfaces.
During fabrication the client made ready the concrete foundations, manifold, gas pipework & controls, this enabled a smooth delivery and commission of the plant.