Biomass – 100kW Bolton

150kW Fröling Wood Chip Boiler

A Fröling P4 100 wood pellet boiler was to be installed on to a purpose built skid. The skid was built in our fabrication workshop and delivered to site where it was positioned and commissioned. A flue was also installed.

An external 10 tonne galvanised pellet silo was positioned outside the warehouse. Pellets are delivered to the boiler via an automatic suction hose.

Shaw Renewables Biogas Boiler

Sector:         Industrial

Location:     Bolton

Fuel:              Pellets

SERVICES PROVIDED:

  •  Design of RHI compliant system
  •  Installation and commission of Fröling P4 Pellet Boiler
  •  Installation of skid mounted plant equipment
  •  Installation 10 tonne Pellet Silo
  •  Installation of Pipework

PLANT ROOM:

A skid installed into a pre-existing warehouse accommodates:

  • 100kW Fröling P4 Biomass Boiler
  • Loading Pump
  • Expansion Vessel
  • Pipework
  • 2no. 50kW Fan Coil Blowers

HEAT USAGE:

Space heating:

  • Warehouse