Great Ayton, N. Yorkshire

75kW Fröling Woodchip Boiler

With milk prices in decline and production costs on the rise, our customer needed to diversify and save money – the need for large amounts of hot water on a dairy farm made a biomass boiler the perfect solution to cutting production costs quickly.

new sheepfold1

The was does of parlour equipments and a hot swill out of the milk tank everyday were costly on our customer’s electric hot water system. The woodchip biomass boiler ensures hot water is delivered on demand 24 hours a day at a fraction of the cost and almost no recovery time needed.

The switch from an oil fuelled burner and electric immersion has reduced our customer’s fuel costs by over £250 a month, making a real impact on their production costs.

A pre-existing barn houses the biomass boiler, buffer tanks and custom built fuel store. The compact nature of the system allows the building to continue being used as a barn. We installed pre-insulated mains pipes to carry heat for domestic hot water and space heating from the plant room across the yard to the farm house and herdsman’s house.

The dairy has constant 87˚c water for wash down, equipment cleaning and bulk tank swilling. The farm house and herdsman’s house have thermostatic space heating provided with radiators. All of the domestic hot water needs of both properties are easily met by the biomass system.

 

 

 

SERVICES PROVIDED:

Froling T4

The installation of

  • 75kW Fröling T4 Woodchip Boiler
  • 2 x 1,800L buffer tanks
  • Automated fuel feed
  • Pipework
  • Boiler Commissioning
  • Fuel store
  • Design of RHI compliant system

SYSTEM FEEDS:

  • 2 properties
  • dairy - milking parlour
  • milk tank
  • water for calf milk preparation

PLANT ROOM:

Existing outbuilding

FUEL STATISTICS:

Fuel savings: £3,000 per annum (oil vs. wood chips)

RHI : Over £8,000 per annum / over £160,000 of total payments over 20 years

Capital return: 7-8 years (based on RHI payments only)