Götzberg, Germany

549kW  –  Maize Silage

Installed by BioConstruct in : 2007

Götzberg biogas plant

This biogas plant was commissioned in 2007 and runs with an average utilisation of 99%. Heat is delivered to a pid breeding farm and a plant nursery. With an installed capacity of 549kWel the biogas plant produces electricity for approx. 1,100 households.

 

Location:

Götzberg, Germany

Installed by BioConstruct:

2007

Feedstock:

Maize Silage

Power:

1 x 549kW CHP