Bukovec, Czech Republic

600kW  –  50% Solid Manure

Installed by BioConstruct in : 2009

Biogasanlage_Bukovec_472_03

This biogas plant was fully commissioned by the end of 2009 and was on full load within 4 weeks, despite it running on 50% solid manure. BioConstruct designed and built the plant ensuring the technology was flexible enough to allow their client to use different substrates.

Logo Bioconstruct englisch_GvK_090623                To find out more about our biogas plant partners BioConstruct, click here.

 

Location:

Bukovec, Czech Republic

Installed by BioConstruct:

2009

Feedstock:

50% Solid Manure

Power:

1 x 600kW CHP